There will be an emergency plan that lists the priority of services being connected, likely starting with connecting the grid backbone to ensure a black start (if power stations were impacted) will be successful since power plants also need the power to be operational. Then, they would likely follow high-priority buildings such as hospitals. Residences would likely be the last to be connected.