That’s what we are doing. Fission reactors started relatively small to test things before larger power plants were built. All current fusion reactors are too small for a power plant, they are used to test the concepts.
Smaller reactors don’t work exactly like larger reactors, however. Many processes depend on the ratio of surface area (e.g. energy losses to the outside) to volume (e.g. heat production), some components cannot easily change their size, and so on. Current fusion reactors are not large enough to release more energy from fusion than we put in for heating, they are simply too small for that. That makes some aspects very difficult to test. ITER, currently under construction, is needed to run a reactor that actually produces a lot of fusion.