European Bridge Design

609 viewsEngineeringOther

how were bridges designed before, say 1850, sometimes way before, able to handle the weight of a ww2 tank?

Were they overbuilt by orders of magnitude, miracle of the arch, or something else?

In: Engineering

8 Answers

Anonymous 0 Comments

Survivorship bias. Before structural engineering was truly codified like it is today, you had a lot of variability in structures with a much larger range of over built and under built structures. The over built ones survive. The under built ones did not.

You are viewing 1 out of 8 answers, click here to view all answers.