How did the TV series Extreme Makeover Home Edition ‘build’ a new house in a week?

3.44K viewsEngineeringOther

I know enough about construction to know that a foundation needs at least 2 weeks to cure enough to be built on, yet in the show, they manage to tear down and rebuild an entire house in 7 days? How did they do this? Most of the framing would be modular/prefab so that would be easy to build inside of a wee,.but how do they overcome the obvious issues such as the concrete needing at least two weeks to cure, plus having the city/county/state inspectors inspect each aspect of the build? Or is it more likely that the house takes a month or two to build and with the magic of editing they make it appear that it only took one week.

In: Engineering

31 Answers

Anonymous 0 Comments

I was on one. Hot concrete that cures at a fraction of the time and an inspector on call 24 hrs a day. I don’t know if the walls were pre fabbed or not. The work runs 24 hours a day. The job finished in the seven days.

You are viewing 1 out of 31 answers, click here to view all answers.