How did the TV series Extreme Makeover Home Edition ‘build’ a new house in a week?

3.37K viewsEngineeringOther

I know enough about construction to know that a foundation needs at least 2 weeks to cure enough to be built on, yet in the show, they manage to tear down and rebuild an entire house in 7 days? How did they do this? Most of the framing would be modular/prefab so that would be easy to build inside of a wee,.but how do they overcome the obvious issues such as the concrete needing at least two weeks to cure, plus having the city/county/state inspectors inspect each aspect of the build? Or is it more likely that the house takes a month or two to build and with the magic of editing they make it appear that it only took one week.

In: Engineering

31 Answers

Anonymous 0 Comments

They obviously don’t.

It’s TV. Everything you see is staged and the people need to wait months before going back to the house.

Remember “Pimp my ride”?
Very famous for telling massive BS to the viewers. Look it up on youtube you will be baffled.

You are viewing 1 out of 31 answers, click here to view all answers.