How did the TV series Extreme Makeover Home Edition ‘build’ a new house in a week?

3.42K viewsEngineeringOther

I know enough about construction to know that a foundation needs at least 2 weeks to cure enough to be built on, yet in the show, they manage to tear down and rebuild an entire house in 7 days? How did they do this? Most of the framing would be modular/prefab so that would be easy to build inside of a wee,.but how do they overcome the obvious issues such as the concrete needing at least two weeks to cure, plus having the city/county/state inspectors inspect each aspect of the build? Or is it more likely that the house takes a month or two to build and with the magic of editing they make it appear that it only took one week.

In: Engineering

31 Answers

Anonymous 0 Comments

You can also still order full built, none doublewides houses, from magazines. They come fully furnished with everything set and ready to be moved in. Might take more than a week but there are so many many companies out there that have pre-fab houses ready to transport, hook up to water/sewer/power that all they do is haul it down make a foundation and hook things up.

Like others said somethings are done in advance but it’s totally possible to get a full on up to date home in time it takes to transport and hook up utilities. I can’t find it right now but there are magazines advertising these homes. You can get a 3 bed 2 bath fully ready to live in for 80k, plus whatever it costs for utility hook up.