Title says it all; I’m sure a thin layer of cement will be left over after they poor it all, and I would imagine that thin layer would harden and then the next time they use the mixer another thin layer would be leftover and so on and so forth. After a while I would imagine it would accumulate to the point where it renders the mixer unusable.
Why is this not the case?
In: Engineering
Theres a video by Veriatsium on Youtube, where the theme of the video is, how it would feeand what would happen, if you get drowned in cement. try find it, I think its still relatively new.
He states there, that usually the time is right to bring the cement to the job site and back, but when there is some bad traffic or something, the drivers of the trucks would always keep one or two bottles of Cola with them. Apperenetly some chemical in the Cola lets the cement be liquid for longer than the usually and gives them time to drive back to the job site or the their workplace.