I worked on underground coring rigs 1000m hole is considered deep. I would run downhole gyro surveys to get an idea of where the hole is headed (deviation) and sometimes the amount of “corkscrewing” the rod string would do amazed me. In that world it’s all about water. Pump water down the line and return it up the hole. The string is fitted with a reaming shell that bores the hole a bit bigger than the bit. Aside from that is grease (to fill small cracks), and mud to reduce torque.
Latest Answers