IIRC they also have a deal with a UK company to lay a HVDC cable to GB. It is a long term power supply deal that is supposed to be a big part of the UK’s electrical supply. Most of these types of programs are not started until there are long term contracts in place at a minimum to be able to borrow the capital required to build the facility.
Latest Answers