I know enough about construction to know that a foundation needs at least 2 weeks to cure enough to be built on, yet in the show, they manage to tear down and rebuild an entire house in 7 days? How did they do this? Most of the framing would be modular/prefab so that would be easy to build inside of a wee,.but how do they overcome the obvious issues such as the concrete needing at least two weeks to cure, plus having the city/county/state inspectors inspect each aspect of the build? Or is it more likely that the house takes a month or two to build and with the magic of editing they make it appear that it only took one week.

In: Engineering

31 Answers

Anonymous 0 Comments

Home near me was on this show. Most of the framing was completed weeks prior and set up in a staging area. When it came time to build, it was basically just putting the puzzle pieces together. Worked 24/7 for a week straight.

You are viewing 1 out of 31 answers, click here to view all answers.