I see solar farms along the highway as well a high capacity power lines, so can they just tap directly into those lines or does the power have to go to a substation before being transferred over those lines?
if it’s very similar voltage they just need a Controller, otherwise also a transformer. https://www.google.com/search?q=solar+controllers same principal for residential commerical tie ins or municipal size grids